This Double Flanged Tripod Foundation is designed to be installed in Loose, Soft Earth or Clay type Ground, as the Bracing legs simply assists in securing the DART Unit in High Wind conditions before the DART unit automatically Stows in the horizontally position.
We highly recommend using EdenCrete Carbon Rich Concrete additive Nano-fibres made by EdenCrete, it comes in a concentrated liquid you add to the Concrete & thoroughly mix into the Concrete BEFORE you actually Pour into the Foundation.
IMPORTANT: We recommend you First excavate the 20cm wide Tripod Trenches, as there is a higher possibility of Dirt/Ground falling into the main Auger hole, that would be difficult to Remove.
Foundation & Bracing.
Assembled.
2~3mt Deep Foundation Pole.
Use Narrow Excavator Bucket to Dig the Beam supports.